Logo 中文 英文
HOME ABOUT BUSINESS
CASE NEWS CONTACT
Your current position:HOME >> NEWS >> Company news >>

Clean room planning general planning focus

Date:2023-02-24  Click:1006
 The whole plant planning of clean room, because it involves a very wide range, the need for construction, water and electricity, air conditioning, environmental protection, shock, manufacturing and other professionals to plan together, although many clean room planning, much need on the existing buildings, however, in order to avoid mistakes should be confirmed as far as possible in advance of the following matters:
 
1. Cleanliness level;
 
2. Chamber pressure balancing measures;
 
3. Temperature and humidity requirements;
 
4. The necessity of machinery and equipment;
 
5. Determine the production process;
 
6. The necessity of local exhaust;
 
7. Expand elasticity in the future;
 
8. Adequate maintenance space;
 
9. Air supply mode of air conditioner;
 
10. Arrangement of staff rest area;
 
11. Disposition of facilities and power;
 
12. Indoor net height and floor load;
 
13. Equipment space and pipeline;
 
14. Doors and Windows should be less, and air tightness should be better;
 
15. Static electricity, vibration and noise;
 
16. Less handover between production line and active line;
 
17. Public hazards, pollution and disaster prevention;
 
18. Measurement of installation and operation costs.

LAST: What is a clean room
NEXT: Is the last!
BACK
Copyright © 2020 Wuxi Wanying Medical Equipment Co., LTD. All Rights Reserved
 
Part of the website pictures from the Internet, if there is infringement, please timely notice, we will promptly replace!